538 Mirror hotel house
BRAND |
MYTOTEL |
PLACE OF ORIGIN |
Chengdu China |
LIFE SPAN |
70 Years |
WARRANTY |
10 Years |
AFTER -SALE-SERVICE |
Customized design drawings,Online technical support, onlin Training, ( Onsite installation for requirement through buyer payment ) |
MODEL |
538 mirror |
LAYOUT |
LOFT 1 bedroom, 1 bathroom, 1 living room |
|
DROUND FLOOR |
|
FIRST FLOOR |
|
|
EXTERIOR COLOR |
Mirror glass |
INTERIOR WALL COLOR |
View color card: https://flbook.com.cn/c/8UupwwAGjz |
FLOOR COLOR |
View color card: https://book.yunzhan365.com/wtkx/vppa/mobile/index.html |
TOTAL AREA |
50㎡(538 SQFT) |
BATHROOM AREA |
4.6㎡(49 SQFT) |
LENGTH |
8.7m |
WIDTH |
4m |
HEIGHT |
5.6m |
VOLUME |
35m³ (Flat packing) |
WEIGHT |
5500KG |
FRAME |
Painted steel frame, external parts galvanized OSB boards |
INSULATION/VENTILATION/HEATING
|
Exterior mirror 140 (or 200) mm insulating (glass wool ,EPS ,polyurethane) Ventilation system Graphene electric underfloor heating |
ROOF |
Exterior mirror 140 (or 200) mm insulating (glass wool ,EPS ,polyurethane) |
FACADE |
Aluminum facade system for glass units (anthracite) 2-layered argon filled glass panels (5+12+5mm/tempered) Vertical metal plate |
DOOR & WINDOW |
Aluminum-framed door (right handed, opening direction: outside) Aluminum-framed window above the entrance door (opening direction: outside) |
CLADDING |
Vertical metal cladding (thermo-ash natural or black coated) |
FOUNDATION & CONNECTIONS |
reinforced concrete footings or rammed metal piles (6 pcs) Power (plug & play) 3x16A, 220V Water pipe (32mm) Sewer pipe (110mm) Air Conditioner (55x110mm pipe and power supply) |
COMMON AREA |
Floor - SPC flooring (color optinal) Ceiling & walls - Integrated wall panels (color optinal), rustic Recessed LED ceiling and spot lights,Sockets, switches and TV connection |
WARDROBE |
2 2190x600x923mm |
KITCHENETTE
|
800x600x2060mm 2 pcs Worktop quartz |
OPTIONAL FACILITIES |
Solar powered Air water supply Sewage system Hotel check-in system Kitchen cabinet, Wardrobe, Bathroom cabinet+mirror, Toilet, Shower, Bathroom sliding door |
USAGE
|
Hotel house,Renting house,Garden bedroom, Villa, Prefabricated modular house,light steel modular structure |
ADVANTAGE |
70 years life-span Easy and fast installation Flat packing |
|
|
BUYER’S PREPARATION
|
Please make sure that the following preparations and conditions at your property are met: 1. The site is accessible to large trucks 2. The foundation and plug-ins prepared by your contractor meet the actual drawings provided by MYTOTEL 3. The foundation is ready to be used 4. Connections to water, sewerage and electricity are ready to be used 5. Your licensed plumber and electrician are able to provide their services 6. Company being responsible for the air conditioner (indoor and outdoor units) are able to provide their services |
|
|
ADDITIONAL RELATED COSTS
|
INSTALLATION COSTS(Buyer entrusts contractor) TEAMS TRAVEL COSTS(Onsite installation for requirement through buyer payment) 1.Travel expenses (to be paid by the buyer based on location) 2.Service fee (500 USD/day/pp) 3.Accommodation and meal expenses (to be paid by the buyer)) FREIGHT OF THE HOUSE (based on location) (transportation price needs to be updated 4 weeks before the loading) |
RELATED PURCHASES |
CHOOSE FROM RELATED PRODUCTS 1.Architectural drawings for applying for permission 2.Optional facilities 3.On site service |
PRODUCTION AND TRANSPORTATION TIME |
Provide EXW, CIF, DDP delivery methods Production takes 30 to 45 days, transportation takes 30 days. |